Last Updated: September 14, 2009 10:58pm 3. Protection of Environment Through Additional Grant Funding 6. Staff Training and Education 8. Revise Tribal Environmental Inventory and Plan (TEI&P) 10. Complete/Update ERRT Documents/Plans 3. Protection of Environment Through Additional Grant Funding 6. Staff Training and Education 8. Revise Tribal Environmental Inventory and Plan (TEI&P) 10. Complete/Update ERRT Documents/Plans 3. Protection of Environment Through Additional Grant Funding 6. Staff Training and Education 8. Revise Tribal Environmental Inventory and Plan (TEI&P) 10. Complete/Update ERRT Documents/Plans 3. Protection of Environment Through Additional Grant Funding 5. Implement Environmental Review Process 6. Staff Training and Education 8. Revise Tribal Environmental Inventory and Plan (TEI&P) 10. Complete/Update ERRT Documents/Plans
New scanner working. New documents will be posted every week. Backlog is considerable.
2009-10, 2010-11, 2011-12, 2012-13 GAP Grant (4 Year Grant) (scroll down for 2005-06 through 2008-09 (4 Year Grant))
Grant Application (to be attached here)
2012-13
4th Quarter
3rd Quarter
2nd Quarter
1st Quarter
2011-12
4th Quarter
3rd Quarter
2nd Quarter
1st Quarter
2010-11
4th Quarter
3rd Quarter
2nd Quarter
1st Quarter
2009-10
4th Quarter
3rd Quarter
2nd Quarter
1st Quarter
2005-06, 2006-07, 2007-08, 2008-09 GAP Grant (4 Year Grant)
2008-09
4th Quarter (6/1/09-08/31/09) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.3 Document Accounting Procedures; Submit Expenditure Reports
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2008; Mar. 2009; June 2009; and Sept. 2009
3. Protection of Environment Through Additional Grant Funding
3rd Quarter (3/1/09-05/31/09) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.3 Document Accounting Procedures; Submit Expenditure Reports
Expenditure Report
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2008; Mar. 2009; June 2009; and Sept. 2009
Quarterly Report
3. Protection of Environment Through Additional Grant Funding
2nd Quarter (1/1/09-02/28/09) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.3 Document Accounting Procedures; Submit Expenditure Reports
Expenditure Report
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2008; Mar. 2009; June 2009; and Sept. 2009
Quarterly Report
3. Protection of Environment Through Additional Grant Funding
3.1 Coordinate with Council in Identifying Tribe's Needs
Environmental Coordinator's Report to Council on 12.20.08
3.3 Submit at Least 4 Grant Proposals During Grant Period
Drafting FY 2009 (4 Year) GAP Grant Application (Deadline Dec. 19., 2008)
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
4.4 Conduct at Least 2 Environmental Educational Events
4.5 Conduct Ongoing Management of Environmental Web Site
12.30.08 Web Site Management
5.1 Review and Comment on at Least 4 Outside Agency Documernts Impacting Tribal Lands
Comments, Ruby Pipeline 2nd Draft Resource Reports Nos. 1 thru 10 12.12.08
Comments, California Native American Hertiage Commission on Ruby Pipeline 12.03.08
5.4 Review and Comment on Any Project that Impact Tribal Resources
Comment, EBI Project # 61085277 12.15.08
Comment, BLM Geothermal Lease Stipulations, Ormat Geothermal Project 12.01.08
7.1 Network to Carry Out Work Plan Components
Collaborative Email, Martin Basin Rangeland DEIS Notice of Availability 12.30.08
Collaborative Email, Petition to EPA on Ozone Transport 12.30.08
Sponsored Meet Tribes Responding to 43 Pounds Box (Reports & Maps), Ruby Pipeline 12/08/08
7.2
7.3 Attend Pertinent Meetings to Coordinate with Other
Attended BLM Ruby Pipeline Meeting, Dec. 2, 2008, Reno, NV
7.4 Host Relevant Meetings
Proof of Hosting Ad-Hoc Tribal Consultation Meeting on Ruby Pipeline 12.08.08
8.1 Revise TEI&P
Noxious Weed Report 12.01.08 (contains information needed for TEI&P)
1st Quarter (9/1/08-12/30/08) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.1 Submit/Update EPA Administrative Checklist
Administrative Report
1.2 Document Findings from Administrative Checklist
Findings Report
Signed Time Sheet
1.3 Document Accounting Procedures; Submit Expenditure Reports
Quarterly Expenditure Report
1.4 Update Financial, Procurement, Etc., Procedures (Comply with 40 CFR)
1.5 Submit Copy of Audit to EPA
1.6 Negotiate and Submit to EPA Indirect Cost Rate Agreement
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2008; Mar. 2009; June 2009; and Sept. 2009
Quarterly Report
2.2 Submit Budget Modification As Needed
3.1 Coordinate with Council in Identifying Tribe's Needs
3.2 Identify Additional Grant Funding
3.3 Submit at Least 4 Grant Proposals During Grant Period
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
1st Qtr E-Newsletter
4.4 Conduct at Least 2 Environmental Educational Events
4.5 Conduct Ongoing Management of Environmental Web Site
5. Implement Environmental Review Process
5.1 Review and Comment on at Least 4 Outside Agency Documents Impacting Tribal Lands
Comment, EPA Draft 2009-2014 Strategic Plan 11.18.08
Review FERC On-line e-Library Ruby Pipeline Project Commments 11.29.08
Comment, FERC Notice of Intent to Prepare EIS (Council Resolution Opposing Notice)
Notice, EPA 2009-2014 Strategic Plan 09.30.08
Review, FERC Notice of Intent to Prepare EIS 09.26.08
5.2 Develope Internal Environmental Review Process in Compliance with NEPA
5.3 Develop Library of Existing and Future Documents
Handbook, Consultation with Tribes During the Section 106 Process
5.4 Review and Comment on Any Project that Impact Tribal Resources
Comment, Ormat Fish Creek Mountains Geothermal Project 11.19.08
Comment, BLM 8100, 6304 Humboldt County Free-Use-Pit EA 11.21.08
5.5 Coordinate with Elders, Leaders and Members to Indentify Areas to be Protected
6.1 Identify Applicable EPA and Non-EPA Training
6.2 Attend Pertinent Trainings and Conferences
Regional Tribal Operations Committee, San Francisco, CA 10.20-21.08
Annual Tribal EPA Conference, San Francisco, CA 10.22-24.08
7. Coordinate with External Agencies
7.1 Network to Carry Out Work Plan Components
7.2 Coordinate with Other to Carry Out Work Plan Components
7.3 Attend Pertinent Meetings to Coordinate with Others
Burning Man, San Francisco, CA 10.24.08
Tribal Coordination Meeting on Ruby Pipeline Project, Reno-Sparks Colony 11.13.08
Tribal Emergency Managers Meeting, ITCN, Sparks, NV, 11.20.08
7.4 Host Relevant Meetings
8.1 Revise TEI&P (formerly 8.1, and 8.3 through 8.6)
9. Solid Waste
9.1 Organize and Conduct Cleanup Project As Provided
Open Pit Dump Tracking Report 09.08.08 (with pictures and GPS information)
9.2 Transport of Waste to be Contracted Out to Private Company
9.3 Conduct Public Meetings and Public Outreach
10.1 Obtain Current ERRT (Environmental Results Reporting Tool)
ERRT Power Point Presentation
10.2 Host Meeting with Council
2007-08
4th Quarter (6/1/08-8/31/08) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.1 Submit/Update EPA Administrative Checklist
1.2 Document Findings from Administrative Checklist
1.3 Document Accounting Procedures; Submit Expenditure Reports
4th Qtr Expenditure Report
1.4 Update Financial, Procurement, Etc., Procedures (Comply with 40 CFR)
1.5 Submit Copy of Audit to EPA
1.6 Negotiate and Submit to EPA Indirect Cost Rate Agreement
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2007; Mar. 2008; June 2008; and Sept. 2008
4th Qtr Report 09.10.08
2.2 Submit Budget Modification As Needed
3.1 Coordinate with Council in Identifying Tribe's Needs
06.20.08 Environmental Coordinator Report to Council
3.2 Identify Additional Grant Funding
3.3 Submit at Least 4 Grant Proposals During Grant Period
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
4.4 Conduct at Least 2 Environmental Educational Events
4.5 Conduct Ongoing Management of Environmental Web Site
Web Site Management 08.20.08 ending at 9:15PM
Web Site Management 08.20.08 ending at 8:17PM
Web Site Management 08.18.08 ending at 11:25PM
Web Site Management 08.18.08 ending at 7:33PM
Web Site Management 08.13.08 ending at 8:04PM
Web Site Management 08.01.08 ending at 9:36PM
Web Site Management 08.01.08 ending at 9:21PM (added on-line remote weather links)
Web Site Management 08.01.08 ending at 8:55PM
Web Site Management 07.30.08 ending at 11:14PM
Web Site Management 07.29.08 ending at 3:06PM
Web Site Management 07.29.08 ending at 1:26PM (approve Guestbook entry)
Web Site Management 07.28.08 ending at 10:43PM (approve Guestbook entry)
Web Site Management 07.24.08 ending at 11:45AM (upload documents for posting on web site)
Web Site Management 07.21.08 ending at 10:19PM
Web Site Management 07.11.08 ending at 4:36PM
Web Site Management 07.07.08 ending at 2:34AM
Web Site Management 06.28.08 ending at 4:33PM
Web Site Management 06.26.08 ending at 6:16PM (approve Guestbook entry)
Web Site Management 06.26.08 ending at 5:21PM (approve Guestbook entry)
Web Site Management 06.18.08 ending at 10:49PM
Web Site Management 06.18.08 ending at 5:28PM
Web Site Management 06.02.08 ending at 2:01PM
5. Implement Environmental Review Process
5.1 Review and Comment on at Least 4 Outside Agency Documents Impacting Tribal Lands
Comment, BLM on Co-Managing Off-Reservation Indian Allotments 07.31.08
Council Resolution SL- 32 -2008 (attached to above Comment)
EPA Notice of Reservation Air Quality Standard 08.22.08
Comment to FERC, Government-to-Government Consultation 08.16.08
Comment, Environmental Coordinator to FERC Archaeologist Laurie Boros 08.07.08
5.2 Develope Internal Environmental Review Process in Compliance with NEPA
5.3 Develop Library of Existing and Future Documents
5.4 Review and Comment on Any Project that Impact Tribal Resources
08.20.08 Comment, FCC TCNS (cell phone Tower Construction Notification System) # 43689
08.13.08 Comment, FCC TCNS # 43421
07.24.08 Comment, FCC TCNS # 42013
07.24.08 Comment, FCC TCNS # 42494
07.24.08 Comment, FCC TCNS # 42495
07.24.08 Comment, FCC TCNS # 42507
5.5 Coordinate with Elders, Leaders and Members to Indentify Areas to be Protected
6.1 Identify Applicable EPA and Non-EPA Training
6.2 Attend Pertinent Trainings and Conferences
Tribal Archaeology Monitoring and NEPA, Reno-Sparks Colony 08.18-19.08
EPA Region 9 Solid Waste Workgroup Meeting, Lake Tahoe, CA, 07.16.08
National Tribal Air Quality Conference, Las Vegas, NV, 06.3-5.08
7. Coordinate with External Agencies
7.1 Network to Carry Out Work Plan Components
7.2 Coordinate with Other to Carry Out Work Plan Components
7.3 Attend Pertinent Meetings to Coordinate with Others
Tribal Coordination Meeting on Ruby Pipeline Project, Ft. Bidwell, CA, 08.14.08
7.4 Host Relevant Meetings
8.1 Revise TEI&P (formerly 8.1, and 8.3 through 8.6)
Tribe/EPA/BOR Developed, Outline, Integrated Management Plan 06.20.08
9. Solid Waste
9.1 Organize and Conduct Cleanup Project As Provided
9.2 Transport of Waste to be Contracted Out to Private Company
9.3 Conduct Public Meetings and Public Outreach
10.1 Obtain Current ERRT (Environmental Results Reporting Tool)
10.2 Host Meeting with Council
3rd Quarter (3/1/08-5/31/08) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.1 Submit/Update EPA Administrative Checklist
1.2 Document Findings from Administrative Checklist
1.3 Document Accounting Procedures; Submit Expenditure Reports
Justification for Equipment Rental 04.08.08
3rd Qtr Expenditure Report
1.4 Update Financial, Procurement, Etc., Procedures (Comply with 40 CFR)
1.5 Submit Copy of Audit to EPA
1.6 Negotiate and Submit to EPA Indirect Cost Rate Agreement
2002-2007 Indirect Cost Rate Agreement (Negotiations completed 03.31.08)
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2007; Mar. 2008; June 2008; and Sept. 2008
3rd Qtr Report 06.03.08
2.2 Submit Budget Modification As Needed
3.1 Coordinate with Council in Identifying Tribe's Needs
Environmental Coordinator Report to Council 03.15.08
Environmental Coordinator Report to Council 04.19.08
Environmental Coordinator Report to Council 05.16.08
Environmental Coordinator Report to Council 06.20.08
3.2 Identify Additional Grant Funding
Email from GAP Project Officer Regarding 2008 GAP Grant Application 05.07.08
3.3 Submit at Least 4 Grant Proposals During Grant Period
$30,000 Clean Water Act, Section 319 Grant Application 05.01.08
$41,682 BOR Native American Program Funds Application 04.18.08
$12,000 BOR Proposal for Moving Above Ground Gasoline Storage Tanks 03.31.08
$12,000 BOR Proposal for Soil Analysis of Petroleum Spills 03.31.08
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
3rd Qtr Newsletter
4.4 Conduct at Least 2 Environmental Educational Events
05.17.08 GAP Education Event on Summit Lake Reservation
4.5 Conduct Ongoing Management of Environmental Web Site
05.07.08 Email 6 Web Site Management
05.07.08 Email 5 Web Site Management
05.07.08 Email 4 Web Site Management
05.07.08 Email 3 Web Site Management
05.07.08 Email 2 Web Site Management
05.07.08 Email 1 Web Site Management
05.07.08 Web Site Management (newly re-designed web site on-line; this is notice)
05.02.08 Email 2 Web Site Management
05.02.08 Email 1 Web Site Management
05.01.08 Email 4 Web Site Management
05.01.08 Email 3 Web Site Management
05.01.08 Email 2 Web Site Management
05.01.08 Email 1 Web Site Management
04.30.08 Wed Site Management
03.15.08 Council Approves Major Changes to Web Site Making It GAP Compliant
5. Implement Environmental Review Process
5.1 Review and Comment on at Least 4 Outside Agency Documents Impacting Tribal Lands
Comment, To Kris Dobschuetz re Ruby Pipeline Project 05.27.08
Comment & Protest to FERC, Extend Comment Period on Ruby Pipeline Project 05.01.08
5.2 Develope Internal Environmental Review Process in Compliance with NEPA
5.3 Develop Library of Existing and Future Documents
5.4 Review and Comment on Any Project that Impact Tribal Resources
03.14.08 Comment, NV Notice Recycling Human & Hazardous Waste
03.28.08 Comment, FCC TCNS (Cell Phone Tower Construction Notice System) # 1387
03.28.08 Comment, FCC TCNS # 25205
03.28.08 Comment, FCC TCNS # 26197
03.28.08 Comment, FCC TCNS # 34458
03.28.08 Comment, FCC TCNS # 35390
03.28.08 Comment, FCC TCNS # 37075 # 1
03.28.08 Comment, FCC TCNS # 37075 # 2
03.28.08 Comment, FCC TCNS # 37075 # 3
04.09.08 Comment, FCC TCNS # 37992
5.5 Coordinate with Elders, Leaders and Members to Indentify Areas to be Protected
6.1 Identify Applicable EPA and Non-EPA Training
6.2 Attend Pertinent Trainings and Conferences
GAP Workshop, San Francisco, CA, 03.11-13.08
Supervising Pesticide Application Training, BIA, Carson City, NV, 05.14.08
Emergency Managers Meeting, Wells Band Te-Moak Tribe, NV, 04.01.08
RTOC, San Francisco, CA, 04.22-24.08
Solid Waste Plan Writing Workshop, St Paul, MN, 05.20-22.08
7. Coordinate with External Agencies
7.1 Network to Carry Out Work Plan Components
7.2 Coordinate with Other to Carry Out Work Plan Components
7.3 Attend Pertinent Meetings to Coordinate with Others
7.4 Host Relevant Meetings
8.1 Revise TEI&P (formerly 8.1, and 8.3 through 8.6)
TEI&P (to be inserted here)
9. Solid Waste
9.1 Organize and Conduct Cleanup Project As Provided
Communication with EPA Region 9 Solid Waste Circuit Rider 05.27.08
9.2 Transport of Waste to be Contracted Out to Private Company
9.3 Conduct Public Meetings and Public Outreach
10.1 Obtain Current ERRT (Environmental Results Reporting Tool)
Submitted Mini ERRT 03.04.08
10.2 Host Meeting with Council
2nd Quarter (12/1/07-2/29/08) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.1 Submit/Update EPA Administrative Checklist
1.2 Document Findings from Administrative Checklist
1.3 Document Accounting Procedures; Submit Expenditure Reports
2nd Qtr Expenditure Report
1.4 Update Financial, Procurement, Etc., Procedures (Comply with 40 CFR)
Council Resolution Updating Tribal Office Procedures 02.16.08
Council Resolution Updating Obtaining Council Members Signatures 02.16.08
Council Resolution Changing Location of Primary Administrative Office 02.16.08
1.5 Submit Copy of Audit to EPA
1.6 Negotiate and Submit to EPA Indirect Cost Rate Agreement
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2007; Mar. 2008; June 2008; and Sept. 2008
Council Resolution Creating Environmental Protection Department 02.16.08
2nd Qtr Report 03.03.08
2.2 Submit Budget Modification As Needed
3.1 Coordinate with Council in Identifying Tribe's Needs
3.2 Identify Additional Grant Funding
3.3 Submit at Least 4 Grant Proposals During Grant Period
$30,000 Clean Water Act, Section 319 Grant Application 01.13.08
$60,000 GAP Grant Application for 2008-09 12.14.07
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
02.06.08 Environmental News Briefs (new publication)
Proof of Mailing of 02.06.08 Environmental News Briefs
02.22.08 Environmental News Briefs
Proof of Mailing of 02.22.08 Environmental News Briefs
2nd Qtr Newsletter
Proof of Mailing 2nd Qtr Newsletter
4.4 Conduct at Least 2 Environmental Educational Events
4.5 Conduct Ongoing Management of Environmental Web Site
Web Site Management 02.12.08
Major Web Site Redesign Changes 01.17.08
Web Site Management (Guestbook Print Out) 01.02.08
5.1 Review and Comment on at Least 4 Outside Agency Documents Impacting Tribal Lands
Review, Notice of Appeal, BLM Decision on Soldier Meadows Grazing Allot Use Plan 02.25.08
First Notice, Ruby Pipeline Project 02.14.08
Comments, Air Pollution Licensed by Nevada by County and Pollutant Jan-Feb 2008
Comment, NV Notice to Issue Operating Permit Class 1 Facility, Ely, NV 12.27.07
Notice, Dept of Energy Closed Meeting in Elko re Draft EIS on Energy Corridor 12.04.07
5.2 Develope Internal Environmental Review Process in Compliance with NEPA
5.3 Develop Library of Existing and Future Documents
5.4 Review and Comment on Any Project that Impact Tribal Resources
Comment, FCC Cell Tower Construction Notification System (TCNS) # 33623 12.11.07
5.5 Coordinate with Elders, Leaders and Members to Indentify Areas to be Protected
6.1 Identify Applicable EPA and Non-EPA Training
6.2 Attend Pertinent Trainings and Conferences
RTOC Meeting, Big Valley Rancheria, California 01.29-31.08
7. Coordinate with External Agencies
7.1 Network to Carry Out Work Plan Components
7.2 Coordinate with Other to Carry Out Work Plan Components
7.3 Attend Pertinent Meetings to Coordinate with Others
7.4 Host Relevant Meetings
8.1 Revise TEI&P (formerly 8.1, and 8.3 through 8.6)
TEI&P (to be inserted here)
02.17.08 TEI&P Meeting Sign-In Sheet, Alturas, California
Environmental Isses Identified by TEI&P Meeting Participants02/06/08
Ranking of Environmental Issues by TEI&P Meeting Participants 02/22/08
01.12.08 TEI&P Agenda & Sign-In Sheet, Alturas, California
Static Cling Car Window Emblem for TEI&P Participants Attending TEI&P Meetings
Static Cling Environmental Protection Dept Emblem for TEI&P Meetings
9. Solid Waste
9.1 Organize and Conduct Cleanup Project As Provided
Attended, Solid Waste Workgroup Meeting, ITCN, Sparks, NV 01.16.08
9.2 Transport of Waste to be Contracted Out to Private Company
9.3 Conduct Public Meetings and Public Outreach
10.1 Obtain Current ERRT
10.2 Host Meeting with Council
1st Quarter (9/1/07-11/30/07) (Work Plan Components, Tribe's Commitments, Deliverables)
1. Financial/Administrative Cpacity Building
1.1 Submit/Update EPA Administrative Checklist
1.2 Document Findings from Administrative Checklist
GAP FY 2007-08 Work Plan Component 1, Commitment 1.2 Report 10/25/07.
1.3 Document Accounting Procedures; Submit Expenditure Reports
1st Qtr Expenditure Report.
1.4 Update Financial, Procurement, Etc., Procedures (Comply with 40 CFR)
1.5 Submit Copy of Audit to EPA
1.6 Negotiate and Submit to EPA Indirect Cost Rate Agreement
2. Grant Management/Reporting
2.1 Submit Quarterly Reports: Dec. 2007; Mar. 2008; June 2008; and Sept. 2008
1st Quarter Report Amended 12/30/07.
2.2 Submit Budget Modifications as Needed
12/13/07 Approved Budget Modification (3 pages)
10/04/07 Approved Budget Modification.
3. Protection of Environment Through Additional Grant Funding
3.1 Coordinate with Council in Identifying Tribe's Needs
EC (Environmental Coordinator) Monthly Report to NRD (Natural Resource Dept. Director) Sept 07.
3.2 Identify Additional Grant Funding
3.3 Submit at Least 4 Grant Proposals During Grant Period
$53,833 U.S. Fish & Wildlife Service Tribal Wildlife Grant 09.28.07
$41,775 BIA Noxious Weed Application 11.30.07
4. Environmental Outreach/Public Education
4.1 Communicate with Tribal Members on Environmental Issues
4.2 Hold Public Meetings and Workshops to Keep Tribal Members Informed
4.3 Develop 4 Quarterly Newsletters
1st Qtr Newsletter
4.4 Conduct at Least 2 Environmental Educational Events
4.5 Conduct Ongoing Management of Environmental Web Site
5. Implement Environmental Review Process
5.1 Review and Comment on at Least 4 Outside Agency Documents Impacting Tribal Lands
SLPT Soldier Meadows Protest Letter.
5.2 Develope Internal Environmental Review Process in Compliance with NEPA
5.3 Develop Library of Existing and Future Documents
5.4 Review and Comment on Any Project that Impact Tribal Resources
5.5 Coordinate with Elders, Leaders and Members to Indentify Areas to be Protected
6. Staff Training and Education
6.1 Identify Applicable EPA and Non-EPA Training
6.2 Attend Pertinent Trainings and Conferences
EC (Environmental Coordinator) RTOC and Tribal EPA Conference Attendance Report 10/19/07.
EC Attendance Report on Stream Bank Bioengineering Training 11/27-29/07.
7. Coordinate with External Agencies
7.1 Network to Carry Out Work Plan Components
Networking Email, Controlling Air Pollutants Licensed by Nevada 12.27.08
7.2 Coordinate with Other to Carry Out Work Plan Components
7.3 Attend Pertinent Meetings to Coordinate with Others
7.4 Host Relevant Meetings
8. Revise Tribal Environmental Inventory and Plan (TEI&P)
8.1 Revise TEI&P (formerly 8.1, and 8.3 through 8.6)
TEI&P (to be inserted here)
9. Solid Waste
9.1 Organize and Conduct Cleanup Project As Provided
9.2 Transport of Waste to be Contracted Out to Private Company
9.3 Conduct Public Meetings and Public Outreach
10. Complete/Update ERRT Documents/Plans
10.1 Obtain Current ERRT
10.2 Host Meeting with Council
2006-07 (For copy of EPA's End of Year Report on Tribe's Performance, click here)
4th Quarter (6/1/07-8/31/07)
3rd Quarter (3/1/07-5/31/07)
2nd Quarter (12/1/06-2/28/07)
1st Quarter (9/1/06-11/30/06)
2005-06
4th Quarter (6/1/06-8/31/06)
3rd Quarter (3/1/06-5/31/06)
2nd Quarter (12/1/05-2/28/06)
1st Quarter (9/1/05-11/30/05)